You are here

Small Value Invitations

Project Invitation Type Duration Period Post date File
Supply and Installation of Emergency Exit at Philippine Eye Research Institute To Submit Quotation 30 Calendar Days 2016-04-21 File, File, File, File
PROPOSED RETROFITTING OF MEDICAL LIBRARY, College of Medicine, UPM To Submit Quotation 60 Calendar Days 2016-03-10 File, File, File
Annual Preventive Maintenance for the ACU of CAD To Submit Quotation 365 Calendar Days 2016-03-01 File, File
Proposed Faculty Room at NIH, Room 114 GF, NIH, UPM To Submit Quotation 60 Calendar Days 2016-02-24 File, File, File
Structural Integrity Test of CP, College of Pharmacy, UPM To Submit Quotation 60 Calendar Days 2016-02-24 File, File
Proposed Extension Room of Accounting Office, 8/F Left Central Block, PGH Compound, Taft Ave,... To Submit Quotation 60 Calendar Days 2015-11-24 File
Expansion and Modernization of Prosthodontics Laboratory, 3/F College of Dentistry, UPM To Submit Quotation 60 Calendar Days 2015-11-24 File
Reconstruction/Redesign of Canopy (Front Lobby), Sotejo Hall, College of Nursing, UPM To Submit Quotation 90 Calendar Days 2015-11-24 File
Repair of Leaking Roof and Replacement of Damaged Ceiling, Dualan Hall and Dissecting Room,... To Submit Quotation 60 Calendar Days 2015-11-24 File
Wateroproofing of UPM Museum Roof Deck To Submit Quotation 45 calendar days 2014-09-09 File, File, File
Restoration of UPM Museum To Submit Quotation 45 calendar days 2014-09-09 File, File, File
SUPPLY AND FABRICATION OF FIRE EXIT PLATFORM AND STAIRWAY (Phase 2), 4TH and 3RD Floors, CD, UPM To Submit Quotation Ninety (90) Calendar Days 2014-08-29 File, File, File, File, File, File, File
RENOVATION OF FACULTY ROOM (Phase 1) To Submit Quotation Sixty (60) Calendar Days 2014-08-28 File, File, File, File, File, File, File, File
WATERPROOFING WORKS OF ROOF DECKS, RH, CAS, UPM To Submit Quotation 60 Calendar Days 2014-07-28 File, File
STRUCTURAL INTEGRITY TEST OF GAB, College of Arts and Sciences, UPM To Submit Quotation 30 Calendar Days 2014-07-28 File, File
STRUCTURAL INTEGRITY TEST OF CAMP BLDG College of Allied and Medical Profession, UPM To Submit Quotation 30 Calendar Days 2014-06-18 File, File
RENOVATION OF OASH AND PROJECT DEVELOPMENT OFFICE 8TH Floor, Central Administration, Right Central... To Submit Quotation 30 Calendar Days 2014-06-18 File, File
SUPPLY AND INSTALLATION OF STAINLESS HANDRAIL 2ND Floor, IPO, Damian Hall, Joaquin Gonzales... To Submit Quotation 30 Calendar Days 2014-06-18 File, File
SUPPLY AND INSTALLATION OF STAIR FLOOR TILES AND HANDRAILS 3/F-4/F, Main and Back Stair, CD, UPM To Submit Quotation 45 Calendar Days 2014-06-18 File, File
SUPPLY AND INSTALLATION OF WINDOWS College of Dentistry, UPM To Submit Quotation 60 Calendar Days 2014-06-18 File, File

Pages