You are here

Small Value Invitations

Project Invitation Type Duration Period Post date File
SUPPLY AND FABRICATION OF FIRE EXIT PLATFORM AND STAIRWAY (Phase 1) 4TH and 3RD Floors, CD, UPM To Submit Quotation 90 Calendar Days 2014-06-18 File, File
Structural Integrity Test of CAMP Building, CAMP, UPM To Submit Quotation 30 Calendar Days 2014-05-21 File
Supply and Installation of Stainless Handrail, 2/F, IPO, Damian Hall, Joaquin Gonzales Compound, UPM To Submit Quotation 30 Calendar Days 2014-05-21 File
Supply and Fabrication of Fire Exit Platform and Stairway (Phase 1), 4/F and 3/F, CD, UPM To Submit Quotation 90 Calendar Days 2014-05-21 File
SUPPLY AND INSTALLATION OF STAINLESS HANDRAIL To Submit Quotation Thirty (30) Calendar Days 2014-03-19 File
SUPPLY AND FABRICATION OF FIRE EXIT PLATFORM AND STAIRWAY (Phase 1) To Submit Quotation Ninety (90) Calendar Days 2014-03-19 File
SUPPLY AND INSTALLATION OF WINDOWS To Submit Quotation Sixty (60) Calendar Days 2014-03-19 File
SUPPLY AND INSTALLATION OF STAIR FLOOR TILES AND HANDRAILS To Submit Quotation Forty Five (45) Calendar Days 2014-03-19 File
INSTALLATION OF SERVICE DROP AND ADDITIONAL WIRING AND BREAKER, Museum of a History of Ideas, UP... To Submit Quotation Fifteen (15) Calendar Days 2014-01-28 File
SUPPLY AND INSTALLATION OF STAIR FLOOR TILES AND HANDRAILS, 3/F-4/F, Main and Back Stair, CD, UPM To Submit Quotation Forty Five (45) Calendar Days 2014-01-28 File

Pages