INVITATION TO BID [RE-BID]
1. The University of the Philippines Manila (UPM) invites interested BIDDERS to submit proposals for the SPORTS AND WELLNESS CENTER PROJECT (PHASE 1).
The Approved Budget for the Contract (ABC) is THIRTY ONE MILLION SEVEN HUNDRED EIGHTEEN THOUSAND NINE HUNDRED NINETY FOUR PESOS AND EIGHTY ONE CENTAVOS (Php 31,718,994.81); Source of Fund: Incremental Tuition Fund.
2. PROJECT DESCRIPTION:
The project shall cover the construction of the Sports and Wellness Center (Phase 1). The three-storey structure with mezzanine has total floor area of 3,500 sq.m.
2.1 Location: University of the Philippines Manila Compound, 625 Pedro Gil St., Ermita, Manila
2.2 Implementing Agency: University of the Philippines
2.3 Contract Duration: 240 calendar days
3. Open Competitive Bidding will be conducted in accordance with the pertinent provisions of the IRR of RA 9184, specifically Annex E - “Contract Implementation Guidelines for the Procurement of Infrastructure Projects”. Schedule of bidding activities as follows:
4. UP Manila reserves the right to reject any or all bids, to waive any formality or defects therein, or to accept such bids as may be considered most advantageous to UP Manila.
5. All inquiries shall be directed to the SBAC Secretariat: Ms. Elsie San Diego, Tel. No.526-6118.
Attachment | Size |
---|---|
UP Manila - INVITATION TO REBID [SWC BLDG]_Repost 02042015.pdf | 259.56 KB |
BID BULLETIN SWC_3R2015-01_5.pdf | 165.35 KB |
BID BULLETIN SWC_3R2015-02_6.pdf | 130.76 KB |
Feb 2015_PBD.SWC_.pdf | 894.59 KB |
SWC BOQ 11172014.xls | 356.5 KB |
FIRE ESCAPE STAIR DETAILS.pdf | 211.39 KB |
REFLECTED CEILING PLAN BID BULLETIN 2.pdf | 120.74 KB |
WALL SCHEDULE LAYOUT.pdf | 655.47 KB |
Sports & Wellness Center Phase 1.pdf | 11.68 MB |
BID BULLETIN SWC_3R2015-03_7.pdf | 165.4 KB |
BID BULLETIN SWC_3R2015-04_8.pdf | 123.23 KB |
BID BULLETIN SWC_3R2015-05_9 edit cpdmo 2_27_15.pdf | 198.29 KB |
A - FIRE PROTECTION COVEREAGE.pdf | 635.5 KB |
B - WALL LAYOUT UPDATED 22515.pdf | 692.43 KB |
C - STAIRWELL BARRIER DETAIL.pdf | 175.51 KB |
SWC BOQ 2-27-15.pdf | 170.51 KB |
SBAC SWC RESOLUTION 3rd failure.pdf | 219.26 KB |