The Contractor shall furnish all materials, equipment, tools, apparatus, appliances accessories, transportation, labor and supervision required for the complete supply and installation of the subject project, as shown on the drawings and called for in these specifications, ready for use.
Attachment | Size |
---|---|
SUPPLY AND INSTALATION OF WINDOWS @ New College of Dentistry Bldg. | 17.5 KB |