Bid Bulletin/Other Materials

Addendum No. SBAC2015-07

ADDENDUM No. SBAC2015-07

This Addendum No. SBAC2015-07 is issued to modify or amend the Bid Documents for SUPPLY & INSTALLATION OF HIGH DOSE RATE (HDR) REMOTE AFTERLOADING BRACHYTHERAPY (SINGLE BID ONLY) scheduled on 27 May 2015. This shall form an integral part of the Bid Documents. Please see attached document.

Addendum No. SBAC2015-08

ADDENDUM No. SBAC2015-08

This Addendum No. 2015-04 is issued to modify or amend the Bid Documents for SUPPLY & INSTALLATION OF FIRE ENGINE COUPLED WITH FIRE PUMP AND JOCKEY PUMP (SINGLE BID ONLY) – 2ND REBID scheduled on 27 May 2015. This shall form an integral part of the Bid Documents.

1. The above mentioned item is BIDDED BY LOT.

2. Signatories for Envelope 1 and 2 should be the same person – President or General Manager.

Bid Bulletin No. 9 and Revised BOQ

I. Bid Bulletin No 9 - Answers to Queries and Attachments as follows:
1.1 Attachment A - Fire Protection system area coverage lay out
1.2 Attachment B - Updated wall schedule lay out
1.3 Attachment C - Detail of Temporary barrier for 3F Stairwell
II. Revised Bill of Quantities

Bid Bulletin Numbers 7 and 8

Invitation to Bid [2nd Rebid]

INVITATION TO BID [RE-BID]
1. The University of the Philippines Manila (UPM) invites interested BIDDERS to submit proposals for the SPORTS AND WELLNESS CENTER PROJECT (PHASE 1).
The Approved Budget for the Contract (ABC) is THIRTY ONE MILLION SEVEN HUNDRED EIGHTEEN THOUSAND NINE HUNDRED NINETY FOUR PESOS AND EIGHTY ONE CENTAVOS (Php 31,718,994.81); Source of Fund: Incremental Tuition Fund.
2. PROJECT DESCRIPTION:

Bid Bulletin - NIH Bldg Project [Negotiated Procurement 2014 No. 1]

Query: As for the SLC, we would like to know if a Single Largest Contract amounting to at least P490M irrespective of the nature of the contract of the General Contractor plus a track record showing expertise on similar project irrespective of the amount of the Joint Venture partner is an acceptable form of SLC. Please confirm.
Answer:
No. The prospective bidder must have completed a single largest contract (SLC) that is similar to the contract to be bid. The definition of SLC for this project is as follows:

Bid Bulletin - NIH Bldg Project [Negotiated Procurement 2014]

BID BULLETIN No. DB_NP_2014-02
December 10, 2014
SUBJECT: DESIGN AND BUILD OF THE NATIONAL INSTITUTES OF HEALTH BUILDING

The submission of bids was moved to Friday, 12 December 2014, 8:30 A.M. at the 8/F UPM Board Room.
The opening of bids will be at 9:00 A.M. of the same day, also at the 8/F UPM Board Room.
Post qualification and resolution of award will be on Monday, 15 December 2014.
Based on the Bidding Documents, specifically on Annex 4 – CHECKLIST OF ELIGIBILITY, TECHNICAL AND FINANCIAL DOCUMENTS Page 2 # 7

Bid bulletin for SPORTS AND WELLNESS CENTER (PHASE 1) - REBID

Additional instructions on the Fire Protection included in the Bid Bulletin.

The submission of bids will be on or before 12:00 noon, 15 December 2014 at the office of the Internal Audit. Opening of Bids will be on the same day, 1:30 pm at the UPM Social Hall.

SPORT AND WELLNESS CENTER (PHASE 1) - REBID

REVISED BIDDING SCHEDULE
1. As a result of the SBAC-SWC meeting held on November 27, 2014, a Prebid Conference instead of the scheduled dropping and opening of bids will be held on December 1, 2014, 1:30 PM at the 8/F Social Hall.
2. The Submission of Bids will be on or before 12:00 noon, 15 December 2014 at the Office of Internal Audit, 8/F PGH Compound, Taft Avenue, Manila.
3. Opening of Bids will be on 15 December 2014 at 1:30 PM, 8/F Social Hall, PGH Compound, Taft Avenue, Manila.